12' X 16' Saltbox Style Storage Shed Project Plans -Design #71216

12' X 16' Saltbox Style Storage Shed Project Plans -Design #71216
12' X 16' Saltbox Style Storage Shed Project Plans -Design #71216
12' X 16' Saltbox Style Storage Shed Project Plans -Design #71216

Key features

  • •Roof Style : Saltbox , Foundation : Skid
  • •Building Size : 12' x 16' , Total Sq. Ft : 192 Sq. Ft
  • •Overall Height : 9' , Roof Pitch : 6/12
  • •Roof Span : 12' , Door : 60" x 73"
Colorbeige

12' X 16' Saltbox Style Storage Shed Project Plans -Design #71216

List Price: $38.70$34.83DEALYou Save: $3.87 (10%)
Free shippingFree Returns – 30 daysFree Order CancellationSecure Payment2–3 Days DeliveryGet It October 25, 2026In Stock (1)No marketing spamNo account requiredFulfilment by FedEx / Amazon / UPS / ShipwirePayPal / Card Buyer Protection

Customer Reviews

Reviews sourced from verified Amazon purchasers
3.2
out of 5
Based on 10 reviews
5★
60%
4★
10%
3★
10%
2★
10%
1★
10%
Nice design. Plans are not as detailed as one might like.
jim•July 26, 2016
These plans are decent but I suspect they have something very similar at the library. I like the design. If I could suggest a change I would add some more pages that explain in more detail and use more illustrations. Also - there didn't seem to be any mention of a foundation.
Poorly Thought Out / Impossible in Areas
Amazon Customer•July 7, 2016
I've been fighting with these plans the whole time and wish I'd never bought them. Poorly designed, do not buy these plans.

For example, the roof sheathing calls for 99" plywood. There is no such thing as a 99" piece of plywood.

You'll run into all kinds of stupid design flaws like this throughout the plans. After redesigning all the poor choices and outright impossible layouts in this I have ended up basically redoing the entire plan.
Storage Shed
Phil1940•June 7, 2016
Good plan, OK for someone with a little building expoerience
Five Stars
kevin Thompson•May 7, 2016
Outstanding plan set.
No attention to the foundation at all except to say ...
Intel Junkie•June 22, 2015
No attention to the foundation at all except to say to spread gravel. Not very well written. A lot of these available for free on the net
Page 1 of 2

Related products